INSTALLATION INSTRUCTIONS XCB7000(shown installed to 1-1/2" NPT columns as example only)Extra Large Back-to-Back Dual Column
XCB7000 Installation Instructions102. While supporting both sides of display, lower display ontocenter of ceiling mount, hooking top of interface brac
Installation Instructions XCB700011TiltNOTE: Two people will be required to adjust the tilt when thedisplay is installed.The interface brackets allow
XCB7000 Installation InstructionsUSA/International A 6436 City West Parkway, Eden Prairie, MN 55344P 800.582.6480 / 952.225.6000F 877.894.6918 / 952.8
XCB7000 Installation Instructions2DISCLAIMERMilestone AV Technologies and its affiliated corporations andsubsidiaries (collectively "Milestone&qu
XCB7000 Installation Instructions3DIMENSIONS15.75400.0MAX VERTICALCOLUMNS SOLDSEPARATELY2" TOTAL HEIGHT ADJUST1" UP/1" DOWNPADLOCKHOLEC
XCB7000 Installation Instructions4LEGENDTighten FastenerApretar elemento de fijaciónBefestigungsteil festziehenApertar fixadorSerrare il fissaggioBeve
Installation Instructions XCB70005TOOLS REQUIRED FOR INSTALLATIONPARTS#21/2" or 13mm3/32"5/32"3/16"(included) M5 C (6) E
XCB7000 Installation Instructions6INSTALLATIONNOTE: The following procedure assumes that 2 UL Listed CPAor CMA ceiling plates (not included) and 2 ext
Installation Instructions XCB7000713. Repeat Steps 10 through 12 for remaining array head (FF),assuring that second array head is approximately level
XCB7000 Installation Instructions88. Tighten two 5/16" x 3/4" set screws (BB) through each arrayhead (FF) and against column. (See Figure 8)
Installation Instructions XCB700097. Add one end cap (X) to each end of mounting rail (MM), andfasten in place using two 1/4-20 x 1/2" Phillips s